Stud Link Anchor Chain Version 1

With first and anchor shots

The anchor chain is assembled from the first and the anchor shots with several intermediate shots, connected by means of connecting links. It is intended to be used in the anchor handling arrangements of ships and floating facilities.

Materials
1 — carbon steel;
2/2W — alloy steel;
3/3W — alloy steel with additional heat treatment.

External coating
BIT — bitumen paint, 1 layer, ISO 12944-5

Standard
ISO 1704
Strength characteristics meet Class Rules including IACS design, construction and operation standards.


Foreign economic department

Olga Sharonova

Foreign economic department

Olga Sharonova

Contact us for cooperation, prices and availability: